Home

The Whitby Esk Energy – Ruswarp Hydro

a community-owned 50kW Archimedes screw hydroelectric turbine on the River Esk at Ruswarp, near Whitby, North Yorkshire
Whitby Esk Energy is a member

a member 0f

The scheme is run by volunteers through Esk Energy (Yorkshire) Limited, a registered society.  Our main aim is to reduce the carbon footprint of the Esk Valley through generating renewable electricity. Learn – Share – Educate


Arrival of the turbine

The Archimedes screw turbine is expected to arrive on site about 9am on Tuesday 4th September.

Please come and join us watch the turbine being lowered into place during the morning, weather permitting.

We will gather on the pavement of  The Carrs (B1410), on the opposite side of the river to the site – map.

Tea and coffee will be available in Ruswarp Village Hall during the morning.

Before you travel check  the Latest Tweets section on the Home page of our website for updates on timings.

If you don’t manage to come and watch it arrive, then look out  for photos and hopefully a video on our website.

Getting ready for arrival of turbine

Getting ready for arrival of turbine